ENERGY-SAVING HVAC

Low-carbon HVAC equipment for contractors, distributors and hotel and property projects

Energy-saving HVAC equipment for engineering contractors, distributors and project buyers. KALDWIN TECH confirms energy, refrigerant and conformity documents per project, and says so before quotation when a file is incomplete.

Quotations carry an energy and refrigerant data sheet, a packing list with installation drawings, and a Declaration of Conformity where the underlying test reports exist. One contact, one specification, one point of liability.

Illustrative placeholder illustration for the energy-saving HVAC line

Illustrative placeholder illustration. Line photography is provided on request.

01 / Buyers

Who buys this line

Four buyer types, and what each one actually reviews before an order.

Engineering contractors

A quotation against your drawings, schedule or BOQ, with installation drawings inside the packing list.

Wholesalers and distributors

Model and parameter confirmation before quotation; no model list is published on this site.

Hotel and real-estate projects

Energy and refrigerant data sheets prepared for the project file, confirmed per project.

ESCOs

Efficiency and refrigerant parameters confirmed together with the report that supports them.

02 / Compliance file

What each market requires

This table lists what the destination market requires. It is not a statement about what we hold; each item is confirmed against the actual file before a quotation is issued.

A Declaration of Conformity is a self-declaration that must list the directives and harmonised standards applied. It is only issued when the test reports behind it exist.

What each market requires
Market or checkWhat is required or answered
European UnionCE marking under LVD / EMC / PED, ErP energy information, F-Gas refrigerant rules, RoHS
United StatesUL or ETL listing, DOE energy requirements, AHRI selection data
Gulf and South-East AsiaSASO, G-Mark and national registration

03 / Documents

Energy, refrigerant and conformity documents

Refrigerant type, charge and GWP are stated on the data sheet issued per project, because they depend on the model and the duty point.

Packing lists are matched to the installation drawings, so the crate that arrives on site is the one the installer planned for.

A project is checked againstWhat we confirm before quotation
  • declaration of conformity (directives and harmonised standards)
  • energy and refrigerant data
  • packing list with installation drawings
  • spare parts and after-sales window

Which of these we can confirm for the project under review — in writing, before quotation. If we cannot, we say so at that point.

04 / What we state

What we will and will not state

Two lists, and nothing in between: what arrives with a quotation, and what this page refuses to claim.

  • Quotations carry an energy and refrigerant data sheet and a packing list with installation drawings.
  • A Declaration of Conformity is issued where the underlying test reports exist.
  • We do not publish certificate numbers, and we do not claim a certification we do not hold.
  • Where a file is incomplete for your market, we say so before quotation.

05 / Project

Packing, shipping and project lead time

Packing is specified per project: sea-worthy crating, corner protection and a packing list that matches the installation drawings.

Project lead time, shipping schedule and any split delivery are confirmed per project. No fixed lead time is published here, because it depends on the model, the quantity and the port pair.

06 / Questions

Questions this line attracts

Can you issue a CE Declaration of Conformity?

A Declaration of Conformity is issued where the underlying test reports exist, and it lists the directives and harmonised standards applied. Where a file is incomplete for your market, we say so before the quotation. See the market requirement table.

Do you supply spare parts and after-sales support?

Spare parts and after-sales support are confirmed per model and per project, and are stated in the quotation rather than promised in advance. No response time or service level is published here. Send the model and the site conditions.

Can you quote against our drawings, schedule or BOQ?

Yes. Send the drawings, schedule or bill of quantities, and the quotation is issued per project with an energy and refrigerant data sheet and a packing list carrying installation drawings. Start a project quotation.

View all FAQs

Ready to send the specification?

One inquiry reaches the desk that quotes all three lines. Add every item you need to one list.

Quick Inquiry